Project Overview: Construction in 2019, with a construction area of 5,3300 square meters. Due to the construction period, the two companies cooperated to build. Some of the eaves heights we built were 42 meters, the cup -mouth basis, multi -section pillar stitching hanging, and the total steel volume was about 2800 tons.
Предыдущая: Australia Cowshed